Skip to content
0850 346 41 09[email protected]
Sign in Request a quote

Undoing and redoing changes (Ctrl+Z)

Undo your last change on the board, list, or Gantt chart with Ctrl+Z (Cmd+Z on Mac), and redo it with Ctrl+Shift+Z or Ctrl+Y. All changes made together—linked cards moving, a plan being set, or an assistant’s message—are undone in one step.

  • Project manager
  • Project Member

What is undoing and redoing changes (Ctrl+Z)?

Use Ctrl+Z (Cmd+Z on Mac) to undo your last change on the board, list or Gantt; use Ctrl+Shift+Z or Ctrl+Y to redo it. Who can do this: Project manager; Project member. Linked cards that move together, plan setups, and all changes made by the assistant in a single message are undone as one step.

Steps

  1. Move a card in a project, change its date, drag it in Gantt, or assign a label or person.

  2. Press Ctrl+Z (on Mac Cmd+Z). The change is undone and a message appears at the bottom showing what was reverted 1.

  3. Press again to step back through older actions one by one. If you change your mind, use Ctrl+Shift+Z or Ctrl+Y to redo.

demo screen (with demo data)
  1. 1Undone

What gets undone?

  • Opening a card (undone cards go to archive), title, description, list, order, date, priority, progress, cover, archiving.
  • All linked cards and phases that move together in Gantt; adding and changing dependencies.
  • Assigning people and labels, checklists and items, adding lists and labels, project name and colour.
  • Plans created from documents or via the assistant, and all changes made by the assistant in a single message (one step).
  • Bulk actions in the list menu (sort list, move all cards, archive all cards) and bulk editing in the table (single step).
Warning You can only undo your own changes. If someone else modifies a card after you have, that step cannot be undone and a warning will appear. Deleting cards, comments, files and time logs cannot be undone; prefer archiving before deleting.
Tip While typing in a text box, Ctrl+Z undoes what you typed (browser behaviour). The last 50 steps are saved per project; performing a new change clears previously redactable steps.

Related pages